| The
Automation Doctor is on Call
January,
2005
In
the good old days, the family doctor would make home
visits for emergencies or physical checkups. Those days
are gone but not for customers of Superior Controls.
These days Superior Controls is doing the same as the
oldtime doctors, but for automation/information systems
throughout New England. Superior Controls now has annual
Service Contracts and Preventive Maintenance Agreements
in place for customers in NH, RI, CT, and MA. Why are
these services growing in popularity?
Consider
these actual events:
- An
electrical storm causes a power failure for a 12-year-old
conveyor system moving bar-coded product between six
rooms. The PLC controlling the conveyors loses its
memory due to a dead battery. There is no documentation
or backup software to be found. Superior Controls'engineers
are brought in on an emergency basis to rewrite the
program. This takes two weeks (seven days a week) while
employees manually carry the product from room to room.
Lost productivity costs are estimated at $150K.
- A
pharmaceutical facility has a PC collecting and saving
GMP (validated) data from a batch reactor. Its hard
disk fills up and stops saving data. As a result, the
estimated retail value of the lost batches is approximately
$6M.
Preventive
Maintenance Agreements
The
true cost of business disruptions and late or cancelled
deliveries to customers is often incalculable. It's likely
that these events could have been avoided with some yearly
preventive maintenance. Preventive Maintenance Agreements
(PMA) can provide scheduled PLC battery checks (preventing
loss of programs), and hard disk memory checks (preventing
loss of GMP data), as well as the acquiring of a backup
copy of application programs.
Superior
Controls has more than 40 experienced IT and automation
engineers providing this service for manufacturers throughout
New England. Most often these involve semiannual visits
with a Preventive Maintenance Report submitted after
each visit.
Service
Contracts
Service
Contracts (SC) can provide customers with emergency support
services. Many manufacturers no longer have the staff
or experience to support emergency situations. Most also
cannot afford to have their automation/information system
down for any extended period. With our large group of
engineers on staff, we are able to provide a variety
of Service Contracts that provide quick response times.
Most of our Service Contracts are written for support
for 8 hours a day, 5 days a week, however, 24/7/365 contracts
are also available.
Site
Assessment
Superior
Controls is now providing numerous customers with both
Preventive Maintenance Agreements (PMA) and annual Service
Contracts (SC). The first step, prior to starting a PMA
or SC, is to perform a Site Assessment. The assessment
includes a survey of the equipment and the backup of
the application programs. The resultant Site Assessment
Report documents the PLCs, DCSs, Servers, and Ts in the
defined automation systems. The report provides both
our customers and our engineering staff quick access
to the type of equipment, make and model, and programming
software required to interface the control systems in
an emergency. The cost of Site Assessments and PMAs are
based on the number of controllers, servers, etc. Service
Contract costs are based on the hours of coverage.
Although
each PMA and SC is customized for each facility, the
following benefits are also realized:
- Site
assessments can also include risk assessments and proposals
or recommendations for risk reduction
- Discounts
on consulting services are provided for multi-year
contracts
- Discounts
on retrofit or new projects
These
Service Contracts and Preventive Maintenance Agreements
are providing manufacturers throughout New England peace
of mind and an increased confidence in their automation
reliability. So, if you are sick or need a physical-
go to the hospital and find a doctor. But, if your automation
system is down or needs a check up- call Superior Controls.
|